Shell works of retail unit in Bolton

The works at Wren Bolton were carried out over a 12 week period and included:

  • Strip out of existing retail unit including removal of floor finishes and diamond grinding or shot blasting of sales floor area.
  • Removal of existing front elevation low level glazing, breaking out masonry panels and taking off existing cladding.
  • Steelwork alterations to provide for the installation of new full height curtain walling glazed windows.
  • Floor slab and stall riser works in readiness for new shop fronts.
  • Installation of new fully glazed shop fronts including new auto entrance doors.
  • New cladding and brickwork to complete the front elevation.
  • Pressure cleaning of existing signage towers and bullnose details. Specialist spraying of retained steelwork and cladding.
  • Roofing and gutter works to include new gutter lining, cut edge protection to roof sheets, removal of ducts, installation of roof lights.
  • Re-laid and renewed paving to front of showroom, installed new bollards and kurbs.

Take a look at Wren Bolton's website - www.wrenkitchens.com/showrooms/bolton

Talk to us

If you have any questions about our products or services then please do not hesitate to contact us.

Tel: 0800 0282307

Other Case Studies

Slimming World – Office Fit Out

Catch up on Slimming World

Hako Machines

Board Room and Toilet Refurb

The Cathedral Suite

Corporate Hospitality at Lincoln City Football Club

Race Cottam

Office Refurbishment in Sheffield

Utopia Tableware

Fit out of print room at head office in Chesterfield