Installation of mezzanine floor, staircase and glass balustrade

High street retailer NEXT tasked us with designing and constructing a fully furnished mezzanine floor, complete with full edge protection, stairs and lift access, to comply with current H&S legislation.

The project required meticulous attention to detail and the resulting frameless glass balustrade with hanging handrail became the design feature of this installation.

This project once again demonstrated our ability to meet the demanding brand expectations and challenging timelines to deliver an exceptional structure in a well-known retail setting. 

Talk to us

If you have any questions about our products or services then please do not hesitate to contact us.

Tel: 01522 688771

Other Case Studies

Paradigm Land, Woolwich

Full design, build and fit out

Node 4 Sinks by APSS Joinery

Node 4, Northampton

Strip out, refurbishment and full fit out

Slimming World, Derbyshire

Fit out and extension works of offices and warehouses

LNER, Leeds

Full fit out of LNER’s first class lounge

Lincoln City FC 1884 Bar

Lincoln City Football Club

APSS performed restoration and fit out, including light construction