Chalice Medical Clean Room

The installation of a clean room

Challenge

As part of a larger project Chalice Medical were moving to new premises and required a new clean room creating.

Solution

apss supplied and installed clean room grade industrial double skin steel partitioning to create the new controlled area, extreme care has to be taken to ensure the room reaches the clean room standard. In addition other works were also carried out by apss such as a mezzanine floor, ceilings and flooring.

Outcome

The new large clean room has created the right environment to operate for the medical manufacturer company, the work could all be under taken before Chalice moved into their new premises, ensuring it was all ready for them.

Talk to us

If you have any questions about our products or services then please do not hesitate to contact us.

Tel: 01522 688771

Other Case Studies

Slimming World, Derbyshire

Fit out and extension works of offices and warehouses

LNER, Leeds

Full fit out of LNER’s first class lounge

Lincoln City FC 1884 Bar

Lincoln City Football Club

APSS performed restoration and fit out, including light construction

Marshall Nissan, Lincoln

Marshall Group appointed APSS for full internal fit out of its Lincoln showroom

Octopus Energy, Brighton

Complete fit out for Brighton offices

Slimming World, Alfreton

A complete office fit out, retail interior design and bespoke reception desk